On an international project, everything degrades with distance except one thing: a document. A verbal assurance fades over an ocean; a manufacturer's certificate reads the same in Milan and in Mumbai. That is why this section is built on paper. For a real project it maps the families of requirements the use switches on: fire behaviour, acoustics, emissions, hygiene, endurance under hours that do not forgive.
One discipline holds throughout: which requirements actually matter in that context, the mistake specifiers make most often, what belongs in the specification, and which collections answer. One rule comes before everything: suitability is what the manufacturer has declared and documented — the certificate is theirs, quoted under their name, and where a document does not exist we say so rather than write around it. A beautiful lounge chair moved from a private office into a public waiting area without checking its fire documentation is this trade's most expensive mistake — on any continent.
For the workplace, our core trade, coverage reaches every room a real project contains: executive, open plan, meeting, reception, waiting, break, outdoor, washroom, acoustic treatment — each with its own page and logic. What stays here is the question that precedes them all: what must this space comply with, and how do you write it down so it survives the distance as well as the project?