DVO Office — open-space workstations for a floor that has to fill fast
A growing company rarely has the luxury of a long furniture lead time for a floor of workstations. DVO Office is built for that pace: operative desks, bench workstations and open-space systems held in a 30,000 m² warehouse and shipped just-in-time worldwide, at a strong quality-to-price ratio. The Friuli maker (formerly Della Valentina Office) also covers executive desks, partitions and storage, Made in Europe.
For a large open-space fit-out it means density delivered on time and consistent across phases: stock availability, an 8-year warranty and spare parts for 10 years.
Stock plus scale is what fast-growing Indian floors need: La Mercanti configures DVO workstations bay by bay, one finish schedule throughout.
FAQ
Can DVO Office fill a large open-space floor quickly?
Yes: bench workstations and operative desks are held in a 30,000 m² warehouse and shipped just-in-time, so a large floor can be populated on a tight programme rather than waiting on production. The quality-to-price ratio makes it viable at volume. La Mercanti confirms stock and coordinates the phased delivery.
Will phase-two desks match phase one?
Because the core range is stocked and standardised, a reorder for a later phase matches the first, with the same 8-year warranty and 10-year spare parts. That keeps a growing open space consistent over time. La Mercanti holds the specification so later phases align.
Filling an open-space floor with DVO Office: five steps with La Mercanti
For PMC teams and A&D: workstation density on a tight programme — from layout to phased delivery.
Map the open space and density
Bench runs, circulation, meeting and focus zones: decide the layout and how many positions each phase needs.
Standardise the bench workstation
Fix the operative bench and its cable management so the repeating unit is settled and stockable.
Add executive desks and partitions
Executive desks, screens and storage in the same family complete the floor beyond the benches.
Schedule phased just-in-time delivery
Agree which zones ship when; stock availability keeps later phases matching the first.
Confirm samples and documentation
Approve finishes and warranty documents. La Mercanti manages samples and coordinated freight.